Works supervision and control for the construction of the Gas Sayago regasification plant
Geophysical Survey

Works supervision and control for the construction of the Gas Sayago regasification plant

About the project

Supervision and control of dredging, hydraulic fill, pipeline laying, piling and rock armouring; control of dynamic positioning and of the geodetic and topographic network, through geophysical, bathymetric, oceanographic and geomorphological surveys for the construction of the Gas Sayago regasification plant.

Supervision and control of dredging, hydraulic fill, pipeline laying, piling and rock armouring; control of dynamic positioning and of the geodetic and topographic network, through geophysical, bathymetric, oceanographic and geomorphological surveys for the construction of the Gas Sayago regasification plant.