Sheet piling for the construction of the south apron at the Port of Nueva Palmira
About the project
Installation of 300 m of 12 m long AZ70 sheet piles with a vibratory hammer for the construction of the south apron at the Port of Nueva Palmira.
Installation of 300 m of 12 m long AZ70 sheet piles with a vibratory hammer for the construction of the south apron at the Port of Nueva Palmira.